UK dehumidifier installation

Dehumidifier installation

A desiccant dehumidifier only reaches its duty if the airflow, the reactivation and the controls are set up for that site. Newsome installs the DST range, working with Seibu Giken DST AB, from the survey through to commissioning. Engineers cover the UK, including single units, multi-zone systems and large industrial plants.

Two engineers in orange overalls and yellow hard hats checking pipework, one holding a tablet
  • Survey before the unit is chosen

    Airflow, moisture load, temperature and how the unit will sit in the plant.

  • Commissioned against the duty

    Air volume, heaters, filters, the rotor and the controls are checked before handover.

  • The DST ranges

    Flexisorb, RLZ, CZ, R, RL, DC and DR, including modules on an RLZ system.

  • Access left for later service

    Placement includes a route for filters, the rotor and the heaters.

Ask about an installation

Describe the building or process and any humidity target you already have. Choose Service or maintain existing equipment if the unit is waiting to be installed, or say in the message that you need a new system. We reply by phone or email during opening hours.

Or call 01422 312 562

Monday to Friday, 8.30am to 5.00pm

    How an installation is carried out

    The published sequence is survey, design, installation and commissioning. What is included in a particular job is agreed before the work starts.

    Engineer in a hard hat and high-visibility jacket inspecting overhead pipework with a clipboard

    Site survey

    Engineers look at the operation, the conditions and the space before a unit is recommended.

    • Airflow requirements
    • Moisture load calculations
    • Temperature conditions
    • Ventilation and air change rates
    • Where the dehumidifier can sit
    • Electrical supply and access routes
    • Connection to an existing air handling unit
    Discuss an installation
    Engineer reviewing a pipework drawing on a computer in a plant room

    System design

    The system is set out around the process. DST equipment can be configured on the Recusorb or Consorb principle, depending on the moisture load, the temperature and the dew point.

    • Airflow planning
    • Duct routing
    • Heat recovery
    • Reactivation method
    • Control strategy
    • Access for maintenance
    • Energy use
    Discuss an installation
    Engineer in a hard hat inspecting flanged pipework and a pressure gauge

    Installation

    Mechanical installation, electrical work, ducting, insulation and the parts the unit needs to run. Service access is planned at this stage so later maintenance can be done without taking the plant apart.

    Discuss an installation
    Engineer in green DST overalls operating the control panel of a stainless steel dehumidifier

    Commissioning

    Once the unit is in place, performance is checked against the operating parameters.

    • Air volume tests
    • Control system configuration
    • Reactivation heater checks
    • Filter checks
    • Rotor operation
    • Capacity testing

    People on site are shown basic operation and monitoring so the unit can be used from the first day.

    Discuss an installation

    DST equipment we install

    The full DST range, from compact single-phase units to large industrial models. Each one has its own installation requirements.

    1. Flexisorb, RF and CF

      Process systems where a low dew point is required. Airflow and the reactivation method are set for a stable condition, and the unit is positioned for that duty.

    2. RLZ and CZ

      Larger industrial units, often in chemical, pharmaceutical and food plants. The work includes ducting, heat recovery, service access and control integration.

    3. R and RL

      Mid-range units for stores, cold environments, clean rooms and pneumatic conveying. Position, electrical connection and airflow routing are set for the space.

    4. Flex modules on an RLZ system

      Cooling, heating or filtration modules connected so the airflow through the system stays balanced.

    5. DC and DR

      Compact stainless units for temporary control, flood recovery, laboratories and smaller production. Installation includes the humidistat connection.

    6. An existing ventilation system

      Duct connections, links into an existing air handling unit, building-management controls, heat recovery and balancing across zones.

    Why the installation is handled this way

    Newsome’s background is air handling, process cooling, heating and environmental management, as well as the dehumidifier itself. That is the published basis for the installation work.

    Two engineers inspecting pipework and a control cabinet in a plant room
    • The surrounding system

      Small changes to airflow, duct routes or heat recovery are part of the planning, because they change how the dehumidifier performs.

    • Seibu Giken DST AB

      As an approved partner, Newsome works from DST product information, control methods and engineering support when a system is configured.

    • Coverage

      Regional account managers and service teams cover Scotland, the North, the Midlands, Wales and the South. DST units are delivered across the UK, and the installation team follows with setup and commissioning.

    • After the unit is running

      A maintenance programme covers inspections, filter changes, rotor checks, heater checks, airflow and a performance report. That work is described on the maintenance page.

    After installation

    Commissioning is the handover. Planned care and repairs are separate services.

    1. Plan the maintenance

      Inspections, filters, the rotor, heaters and airflow once the system is in use.

      Read about maintenance
    2. The equipment is not chosen yet

      If you still need a DST dehumidifier, start with sales. Installation support is part of that quote.

      Go to dehumidifier sales
    3. Discuss this installation

      Send the site and the duty, or call 01422 312 562.

      Discuss an installation

    Questions about installation

    What happens on a site survey?

    Airflow, moisture load, temperature, ventilation, where the unit can sit, the electrical supply and any existing air handling unit. The survey is how the unit and the installation method are chosen. It is not offered as a timed or free visit.

    Can a dehumidifier be added to plant that is already there?

    Yes. Published installation work includes duct connections, links into an existing air handling unit, building-management controls, heat recovery and balancing across zones.

    What is checked at commissioning?

    Air volume, the control setup, reactivation heaters, filters, rotor operation and capacity. Staff on site are shown basic operation and monitoring.

    Discuss an installation

    Send the site and what the dehumidifier has to hold.