During cold shutdown, humid air sits in boilers, turbines, generators, vessels and pipework. Corrosion then lengthens the return to service. Desiccant drying is used to preserve plant and spare components while they stand idle, including related duties on wind turbines.

Power generation plant where dry air protects standing equipment
  • Shutdown corrosion

    Idle metal surfaces rust when humid air remains inside the plant.

  • Restart time

    Corroded components delay return to generation and raise repair cost.

  • Spares and stores

    Stored rotors, tubes and assemblies need the same dry-air protection.

  • Continuous drying

    A recirculating desiccant unit holds the enclosed volume dry for the lay-up period.

Preserving plant with dry air

Coatings and inhibitors help. Dry air addresses the vapour that reaches internal surfaces during long outages.

Power generation plant where dry air protects standing equipment

Where moisture attacks

Boilers, condensers, generators, pipework and vessel internals. Wind turbine nacelles and towers face similar idle corrosion.

Stainless steel DST dehumidifier connected to large metal ducts

How drying is run

The volume is closed as far as practical. Dry air is recirculated. Leakage and outdoor humidity set the continuous load.

Steel bridge structure where dry air is used to limit corrosion

Related structure duties

Bridge voids use the same idea of dry air inside a closed steel space.

Read about bridges

From the application to a unit

These notes describe the application. A sale or a hire is a separate conversation, matched to the site.

  1. I need help choosing

    Describe the space, the temperature and any humidity or dew point you already know.

    Get advice
  2. Bridges

    Dry air inside steel voids to slow structural corrosion.

    Read about bridges
  3. I would rather call

    Our office number is 01422 312 562, Monday to Friday, 8.30am to 5.00pm.

    Call 01422 312 562

Questions

Is power-station drying limited to long outages?

Long cold shutdowns are the usual case. Shorter lay-ups still benefit where humid air would otherwise sit on idle plant.

Is the whole power station dried, or selected volumes?

Usually selected volumes: a boiler, a generator enclosure or a store of spares. Scope is agreed with the site team.

What information is required to size a power-station drying system?

Which plant is idle, approximate volumes, how well sealed those spaces are, and the expected duration of the outage.

Get advice

Tell us about the space, the temperature, and any humidity or dew point you already know.

Or call 01422 312 562

Monday to Friday, 8.30am to 5.00pm